Asphalt Toowoomba
Byford Projects recently completed over 4km of extensive asphalt road repair work for Toowoomba Regional Council on the Toowoomba - Cecil Plains Road. We profiled road failures up to a depth of 100mm, and then replaced with 100mm of asphalt.
Using asphalt for roads has many advantages over paved surfaces constructed using other materials. Asphalt expands and contracts according to the temperature, and therefore has a much lower risk of cracking. It is very fast to cure and can be driven on within 24 hours of being paved. It is available in a range of colours and finishes to suit your home or business, and can be shaped to suit any area.
댓글